This project was initiated by the Corporation of Haldimand County. The project replaced an old 100mm
diameter cast iron watermain with a new 200mm diameter PVC watermain and included the removal
and placement of two fire hydrants complete with valves, and the replacement of all water services including
lead and galvanized pipe to the property line.
This project was completed without the use of a temporary main, thereby reducing the costs and service
interruption to the homeowners.
Expertise Applied: |
|
|
• Watermain/Road Design |
|
|
• Construction Documents |
|
|
• Contract Administration |
|
|
• On-Site Supervision |
|
|